Guangdong Jianqiao Testing Equipment Co., Ltd.

Never Settle ,Build the Intelligently Machines In China

Manufacturer from China
Verified Supplier
1 Years
Home / Products / Two Zone Thermal Shock Chamber /

Industrial Two Zone Thermal Shock Testing Chamber 100L Capacity

Contact Now
Guangdong Jianqiao Testing Equipment Co., Ltd.
Visit Website
City:dongguan
Province/State:guangdong
Country/Region:china
Contact Person:MrJohn
Contact Now

Industrial Two Zone Thermal Shock Testing Chamber 100L Capacity

Ask Latest Price
Video Channel
Brand Name :Jianqiao
Model Number :JQTS2-100
Certification :CE
Place of Origin :China
MOQ :1
Supply Ability :300 sets /year
Delivery Time :20 days
Packaging Details :Wooden case
Model :JQTS-100
Temperature Range :-40°C/-55°C/-65°C~+150°C
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Maintenance of Thermal Shock Chamber

Proper maintenance of a Thermal Shock Chamber is essential to ensure its optimal performance, accuracy, and longevity. Regular upkeep helps prevent malfunctions, ensures reliable test results, and extends the lifespan of the equipment.


1. Routine Inspection

  • Visual Checks: Regularly inspect the chamber for any signs of wear, corrosion, or damage.
  • Seals and Gaskets: Check door seals and gaskets for cracks or deformation to maintain proper insulation and prevent leaks.
  • Transfer Mechanism: Ensure the specimen transfer system moves smoothly without obstructions or unusual noises.

2. Cleaning

  • Interior Cleaning: Keep the chamber interior free from dust, debris, and corrosion. Use mild, non-abrasive cleaning agents.
  • Cooling and Heating Elements: Remove dust or dirt from heating elements and cooling coils to ensure efficient operation.
  • Air Filters: Clean or replace air filters periodically to maintain airflow and temperature uniformity.

3. Calibration and Testing

  • Temperature Calibration: Regularly calibrate temperature sensors and controllers against standard reference instruments.
  • Cycle Verification: Verify the accuracy of temperature cycling profiles and transfer times.
  • Data Logging: Maintain records of calibration and maintenance activities for compliance and troubleshooting.

4. Mechanical and Electrical Checks

  • Lubrication: Lubricate moving parts, such as transfer arms and hinges, as per manufacturer recommendations.
  • Electrical Components: Inspect wiring, relays, and sensors for signs of wear or damage. Replace faulty components promptly.
  • Control Panel: Ensure the control interface is functioning correctly and buttons or touchscreens are responsive.

5. Preventive Maintenance Schedule


Frequency Tasks
Weekly Visual inspection, cleaning of interior and filters
Monthly Calibration checks, mechanical inspections
Quarterly Detailed electrical inspection, lubrication, transfer system check
Annually Comprehensive calibration, part replacement as needed, system audit

Additional Tips:

  • Always follow the manufacturer's maintenance manual and guidelines.
  • Use genuine spare parts and accessories.
  • Keep detailed records of all maintenance activities for reference and compliance.
  • Train operators on proper usage and basic maintenance procedures.


Model

JQTS2-50

JQTS2-80

JQTS2-100

JQTS2-150

JQTS2-225

JQTS2-408

Inner size
W*D*H(cm)

35*32*40

50*40*40

50*50*40

65*50*46

65*70*50

85*80*60

Outer size
W*D*H(cm)

125*160*185

135*170*185

140*185*190

160*190*205

160*230*210

180*250*230

Capacityt(L)

50L

80L

100L

150L

225L

408L

Weight(kg) N.W

800

900

950

1050

1250

1450

Temp.Shock Range

A:-40℃~180℃ B:-55℃~180℃ C:-65℃~180℃

Shock type

1. High Temp.→Low Temp. 3. Normal Temp →High Temp. →Normal Temp. →Low Temp.
2. Low Temp →High Temp. 4. Normal Temp →High Temp. →Normal Temp. →Low Temp

High Temp. Chamber

+60°C~+200°C

Pre-Heating Time

(+20°C~200℃) <35 minutes

Low Temp.Chamber

(-40°C/-55°C/-65°C) ~ -10°C

Pre-cooling Time

(+20°C~-75℃ )< 60minutes

Temperature
transfer time

‘-40℃/-55°C/-65℃~+180℃ <5 second (Two Zone)

Recover time

Heat chamber Exposure 30min

Cold chamber Exposure 30 min

within 5~10min

Temp.fluctuation range

±0.5℃

Chamber material

Outer shell : standard 1.5mm electrolytic plate Baked electrostatic painting
Inner shell : standard 1.2mm thick SUS#304 stainless steel plate (matt treatment )

Insulation material


Glass fibre wool + Rigid polyurethane foam

Controller

7'LCD colorful Chinese and English touch screen (10 inch optional ),Program or fix setting ,120sets programs ,1200steps USB ,RS232 /R485 interface ,mobile APP , computer connection remote control (optional network interface )

Control system

P.I.D+S.S.R+Temp control system of microcomputer balance

Cooling type

Semi-closed two-stage compressor (water cooled)
Fully-closed two-stage compressor (air -cooled )

Refrigant

HFC-404a and HFC23 /HFC-R449A/HFC-507

Compressor

Fully closed French “Tecumseh “compressor
Semi-closed German “Bock “/"Bitzer" comporessor

Safety protection device

Fuse free switch, compressor high and low voltage protection switch,Over-temperature potector,Over -current protector , Refrigerant high -voltage protection switch, fault alarm system, electronic sound light alarm device

Spare parts

Glass viewing window , two shelves , 2*50mm cable Ports ,Casters ,

Power Supply

AC/380V,50HZ,20~50A,

Industrial Two Zone Thermal Shock Testing Chamber 100L Capacity







Inquiry Cart 0